leanpana.blogg.se

What is navigational dredging
What is navigational dredging













  • Final Dredge Areas I/N and O Hybrid Dredge Data Report, September 2019 (pdf) (12 MB).
  • Final Dredge Area H Hybrid Dredge Data Report, September 2019 (pdf) (6 MB).
  • Final Remedial Action Report for Operable Unit 1 Subtidal Dredging, September 2020 (pdf) (15 MB).
  • Final Remedial Action Report for Operable Unit 1 Decontamination of the Dewatering Plant, December 2020 (pdf) (6 MB).
  • Final Upper Harbor Sediment Caps Remedial Action Report, April 2021 (pdf) (7 MB).
  • Final East Zone 1 Remedial Action (RA) Report, July 2021 (pdf) (13 MB).
  • Final Intertidal West Zone 1 Remedial Action (RA) Report, Decem(pdf) (13 MB).
  • Final Remedial Action (RA) Report for East Zone 4 and East Zone 5, January 2022 (pdf) (20.8 MB).
  • Final Intertidal West Zone 4 and West Zone 5 Remedial Action Report, Novem(pdf) (15.3 MB).
  • See EPA's PDF page to learn more about PDFs, and for a link to the free Acrobat Reader.Īfter each discrete portion of the shoreline is remediated, an After Action Report is prepared which summarizes the work performed, as well as the levels of PCBs that remain after the remediation is completed.

    what is navigational dredging

    You will need Adobe Acrobat to view some of the files on this page.

    what is navigational dredging

    Harbor Cleanup Plans and Legal/Administrative Records.















    What is navigational dredging